Shanghai Cheng Hao Industrial Co., Ltd.
Address: No. 38, Lane 799, Jiasong Middle Road, Huaxin Town, Qingpu District, Shanghai
Tel: 021-39170382
Fax: 021-39170383
Mail Box: info@sh-cci.com.cn
Website: klusal.cn
Shanghai Cheng Hao Industrial Co., Ltd.
Address: No. 38, Lane 799, Jiasong Middle Road, Huaxin Town, Qingpu District, Shanghai
Tel: 021-39170382
Fax: 021-39170383
Mail Box: info@sh-cci.com.cn
Website: klusal.cn
The emergence of infiltration equipment has brought a lot of convenience to our work. It can be said that it has made a great contribution. In order to make the infiltration equipment better service, we should also maintain the infiltration equipment in peacetime. So what are the specific maintenance steps? Let us infiltrate the equipment company for a detailed introduction.
1. The refrigerator is turned on when the room temperature is greater than 25 °C, and cannot be turned off day and night.
2. The chiller is turned off when working every day and turned on when it is off work.
3. The glue in the liquid storage tank must be free of refrigeration coils.
4. The vacuum pump oil must be replaced after 2 months for the first time, and replaced every 3 months thereafter.
5. The entire unit must use clean compressed air.
6. The water in the cleaning tank and hot water curing tank must be replaced regularly.
7. Refrigeration and air conditioning must be checked once a year.
8, the impregnation tank seal must have a spare all year round.
9. The cylinder is regularly lubricated.
10. Regularly apply butter to the inclined block of the infiltration tank.
11. After the hot water curing tank is refilled, the pH must be adjusted to about 5.
12. Open the valve at the bottom of the canister before work every day, drain the waste liquid and close it for 10 minutes.
The above is what the infiltration equipment company introduces to everyone in the process of use, we must seriously study.